Building Permits Complex Memos

Technical Circular No. (1) Regarding the Reduction of Environmental Impacts Resulting from Surface Sewage Water Leaks and the Prevention of Sewage Water Mixing with Groundwater

Administrative Circular No. (2) Regarding the Recent Updates and the Ongoing Launch of the Electronic Building System

Administrative Circular No. (3) regarding the First Coordination Meeting between the Ministry of Municipality and Environment and Engineering Consultancy Offices

Administrative Circular No. (4) regarding Updates to the Electronic Building Permit System

Administrative Circular No. (5) regarding the Issuance of Building Permits

Administrative Circular No. (6) regarding Updates to the Electronic Building Permit System and the Rejection of Building Applications Not Compliant with the Building Requirements Guide of the State of Qatar

Administrative Circular No. (8) regarding Building Permit Fee Receipts

Technical Circular No. (9) regarding the Review of the House Connections Section for Sewerage Projects at the Public Works Authority (Ashghal)

Administrative Circular No. (10) regarding the Presentation for the Architectural Facades Project

Administrative Circular No. (11) regarding the Launch of the Second Edition of the Building Requirements Guide for the State of Qatar

Administrative Circular No. (12) regarding the Update of Engineering Consultancy Offices’ Data Entered in the Automated Building Permit System for the Year 2022

Administrative Circular No. (13) regarding the Launch of the Service for Changing the Designing Engineering Office

Technical-Administrative Circular No. (14) regarding Building Permit Applications and Building Completion Certificates

Administrative Circular No. (15) regarding the Launch of the Service for Changing the Consulting Engineering Office

Administrative Circular No. (16) regarding Holding a Meeting with Consultancy Offices at Al Rayyan Theater

Circular No. (17) regarding the Launch of the Third Edition of the Building Requirements Guide for the State of Qatar and the First Edition of the Requirements and Services Guide

Administrative Circular No. (18) regarding Holding a Meeting with Consultancy Offices at Al Rayyan Theater

Circular No. (19) regarding the Responsibility of the Consulting Engineering Office in Verifying Architectural, Structural, and Utility Plans

Technical Circular No. (20) regarding the Supervising Consulting Office’s Report on Works Executed at the Construction Site

Circular No. (21) regarding Linking the Building Permit System to Obtain the Master Plan, Coordinates Report, and DXF Report before Submitting the Application to the Municipality

Circular No. (22) regarding the Responsibility of the Consulting Engineering Office – Responsible Manager – Registered Engineers

Circular No. (23) regarding Updates to be Launched in the Electronic Building Permit System concerning (Verification Stage – Returning Building Applications after a Certain Period)

Circular No. (24) – Amendments to Facades and Signage

Circular No. (25) regarding the Acceptance of Undertakings from Contracting Companies

Circular No. (26) regarding the Load-Bearing Certificate

Circular No. (27) regarding the Addition of Two-Factor Authentication Using Google Authenticator for Accessing the Building Permit System

Circular No. (28) regarding the Development and Addition of New Services to the Electronic Building Permit System

Circular No. (29) regarding the Development and Addition of New Services to the Electronic Building Permit System

Circular No. (30) regarding the Temporary Amendment of the Performance Indicator for Engineering Consultancy Offices

Circular No. (31) regarding the Performance Measurement Indicator for Engineering Consultancy Offices

Circular No. (32) regarding the Launch of Services to Obtain Approved Maps

Circular No. (33) regarding Obtaining the Survey Report for Building Completion

Circular No. (34) regarding Civil Defense Measures in Public Housing and Residential Villas

Circular No. (35) regarding Attaching the Material and Specifications Compliance Certificate and the Concrete Cube Sample Test Report

Circular No. (36) regarding the Launch of an Update in the Electronic Building Permit System that Enables the Issuance of Detailed Engineering Plans Ready for Sorting in the Building Completion Stage

Circular No. (37) regarding the Launch of the Service to Assign a Main/Sub Consulting Engineering Office for Communicating with Government Authorities in the Specialties Specified by Them

Circular No. (38) regarding the Reconsideration of Demolition Decisions to Allow Conditional Maintenance

Circular No. (39) regarding Attaching the Entrance Level Report in Building Completion Transactions

Circular No. (40) regarding Attaching the Entrance Level Report in Building Completion Transactions

Circular No. (41) regarding the Application of Performance Indicators on Building Completion Certificate Requests

Circular No. (42) regarding the Fifth Edition of the Building Requirements Guide in the State of Qatar

Circular No. (43) regarding Site Inspection before Starting Architectural Design and During Supervision

Circular No. (44) regarding Notifying the Relevant Municipality before Commencing Work Licensed by the Municipality

Circular No. (45) regarding Transactions Registered in the Electronic Building Permit System before 2024

Circular No. (46) – Launch of the Service for Verifying Detailed Data of the New Permit Format with Planning Requirements

Circular No. (47) regarding Access to Sewer Network Connection Data before Submitting a Building Permit Application through the Electronic Building Permit System

Circular No. (48) – Guide for the Structural Assessment Mechanism of New Buildings and Strengthening or Adding to Existing Buildings in the State of Qatar

Circular No. (49) regarding Updates to the Building Permit System for Building Permit Renewal Requests and Building Completion Transaction Cancellation Requests

Circular No. (50) – Forms, Undertakings, and Authorizations on the Ministry of Municipality Website

Circular No. (51) – regarding the Emphasis on Compliance with the Area and Height Limits Designated for Local Engineering Consultancy Offices

Circular No. (52) – Update of the Fifth Edition of the Building Requirements Guide for the State of Qatar

Circular No. (53) – Update of the Fifth Edition of the Building Requirements Guide for the State of Qatar

Circular No. (54) – regarding the Launch of the Service to Obtain a Survey Report within the Electronic Building Permit System

Circular No. (55) regarding the Service for Verifying Electricity and Water Line Intersections with the Plot within the Electronic Building Permit System

Further to Circular No. (55) regarding the Launch of the Service for Verifying Electricity and Water Line Intersections with the Plot within the Electronic Building Permit System

Circular No. (56) – Invitation to Attend a Meeting (Workshop) regarding the Launch of New Services on the Electronic Building Permit System

Circular No. (57) – Activation of the Artificial Intelligence Tool "Consultant Tool" for Engineering Consultancy Offices

Circular No. (58) regarding the Launch of the Service to Provide Ashghal Data (Road Entrances – Sewerage) with the Plot within the Electronic Building Permit System

Circular No. (59) – Inspection Form for the Consulting Office Designing the Project Site