Technical Circular No. (1) Regarding the Reduction of Environmental Impacts Resulting from Surface Sewage Water Leaks and the Prevention of Sewage Water Mixing with Groundwater
Administrative Circular No. (2) Regarding the Recent Updates and the Ongoing Launch of the Electronic Building System
Administrative Circular No. (3) regarding the First Coordination Meeting between the Ministry of Municipality and Environment and Engineering Consultancy Offices
Administrative Circular No. (4) regarding Updates to the Electronic Building Permit System
Administrative Circular No. (5) regarding the Issuance of Building Permits
Administrative Circular No. (6) regarding Updates to the Electronic Building Permit System and the Rejection of Building Applications Not Compliant with the Building Requirements Guide of the State of Qatar
Administrative Circular No. (8) regarding Building Permit Fee Receipts
Technical Circular No. (9) regarding the Review of the House Connections Section for Sewerage Projects at the Public Works Authority (Ashghal)
Administrative Circular No. (10) regarding the Presentation for the Architectural Facades Project
Administrative Circular No. (11) regarding the Launch of the Second Edition of the Building Requirements Guide for the State of Qatar
Administrative Circular No. (12) regarding the Update of Engineering Consultancy Offices’ Data Entered in the Automated Building Permit System for the Year 2022
Administrative Circular No. (13) regarding the Launch of the Service for Changing the Designing Engineering Office
Technical-Administrative Circular No. (14) regarding Building Permit Applications and Building Completion Certificates
Administrative Circular No. (15) regarding the Launch of the Service for Changing the Consulting Engineering Office
Administrative Circular No. (16) regarding Holding a Meeting with Consultancy Offices at Al Rayyan Theater
Circular No. (17) regarding the Launch of the Third Edition of the Building Requirements Guide for the State of Qatar and the First Edition of the Requirements and Services Guide
Administrative Circular No. (18) regarding Holding a Meeting with Consultancy Offices at Al Rayyan Theater
Circular No. (19) regarding the Responsibility of the Consulting Engineering Office in Verifying Architectural, Structural, and Utility Plans
Technical Circular No. (20) regarding the Supervising Consulting Office’s Report on Works Executed at the Construction Site
Circular No. (21) regarding Linking the Building Permit System to Obtain the Master Plan, Coordinates Report, and DXF Report before Submitting the Application to the Municipality
Circular No. (22) regarding the Responsibility of the Consulting Engineering Office – Responsible Manager – Registered Engineers
Circular No. (23) regarding Updates to be Launched in the Electronic Building Permit System concerning (Verification Stage – Returning Building Applications after a Certain Period)
Circular No. (24) – Amendments to Facades and Signage
Circular No. (25) regarding the Acceptance of Undertakings from Contracting Companies
Circular No. (26) regarding the Load-Bearing Certificate
Circular No. (27) regarding the Addition of Two-Factor Authentication Using Google Authenticator for Accessing the Building Permit System
Circular No. (28) regarding the Development and Addition of New Services to the Electronic Building Permit System
Circular No. (29) regarding the Development and Addition of New Services to the Electronic Building Permit System
Circular No. (30) regarding the Temporary Amendment of the Performance Indicator for Engineering Consultancy Offices
Circular No. (31) regarding the Performance Measurement Indicator for Engineering Consultancy Offices
Circular No. (32) regarding the Launch of Services to Obtain Approved Maps
Circular No. (33) regarding Obtaining the Survey Report for Building Completion
Circular No. (34) regarding Civil Defense Measures in Public Housing and Residential Villas
Circular No. (35) regarding Attaching the Material and Specifications Compliance Certificate and the Concrete Cube Sample Test Report
Circular No. (36) regarding the Launch of an Update in the Electronic Building Permit System that Enables the Issuance of Detailed Engineering Plans Ready for Sorting in the Building Completion Stage
Circular No. (37) regarding the Launch of the Service to Assign a Main/Sub Consulting Engineering Office for Communicating with Government Authorities in the Specialties Specified by Them
Circular No. (38) regarding the Reconsideration of Demolition Decisions to Allow Conditional Maintenance
Circular No. (39) regarding Attaching the Entrance Level Report in Building Completion Transactions
Circular No. (40) regarding Attaching the Entrance Level Report in Building Completion Transactions
Circular No. (41) regarding the Application of Performance Indicators on Building Completion Certificate Requests
Circular No. (42) regarding the Fifth Edition of the Building Requirements Guide in the State of Qatar
Circular No. (43) regarding Site Inspection before Starting Architectural Design and During Supervision
Circular No. (44) regarding Notifying the Relevant Municipality before Commencing Work Licensed by the Municipality
Circular No. (45) regarding Transactions Registered in the Electronic Building Permit System before 2024
Circular No. (46) – Launch of the Service for Verifying Detailed Data of the New Permit Format with Planning Requirements
Circular No. (47) regarding Access to Sewer Network Connection Data before Submitting a Building Permit Application through the Electronic Building Permit System
Circular No. (48) – Guide for the Structural Assessment Mechanism of New Buildings and Strengthening or Adding to Existing Buildings in the State of Qatar
Circular No. (49) regarding Updates to the Building Permit System for Building Permit Renewal Requests and Building Completion Transaction Cancellation Requests
Circular No. (50) – Forms, Undertakings, and Authorizations on the Ministry of Municipality Website
Circular No. (51) – regarding the Emphasis on Compliance with the Area and Height Limits Designated for Local Engineering Consultancy Offices
Circular No. (52) – Update of the Fifth Edition of the Building Requirements Guide for the State of Qatar
Circular No. (53) – Update of the Fifth Edition of the Building Requirements Guide for the State of Qatar
Circular No. (54) – regarding the Launch of the Service to Obtain a Survey Report within the Electronic Building Permit System
Circular No. (55) regarding the Service for Verifying Electricity and Water Line Intersections with the Plot within the Electronic Building Permit System
Further to Circular No. (55) regarding the Launch of the Service for Verifying Electricity and Water Line Intersections with the Plot within the Electronic Building Permit System
Circular No. (56) – Invitation to Attend a Meeting (Workshop) regarding the Launch of New Services on the Electronic Building Permit System
Circular No. (57) – Activation of the Artificial Intelligence Tool "Consultant Tool" for Engineering Consultancy Offices
Circular No. (58) regarding the Launch of the Service to Provide Ashghal Data (Road Entrances – Sewerage) with the Plot within the Electronic Building Permit System
Circular No. (59) – Inspection Form for the Consulting Office Designing the Project Site